The reference cases provided input for the brainstorm sessions to broaden the perspectives of the participants and to deliver new approaches or spatial concepts that could be useful to help “solve” the problem statement of the study case. Reference cases can be found via the year table or via entering key words in the search field in the left column of the reference case web page. 

Reference cases

This project includes the opening up of St George street and the comlete reconstruction of the pavements and the gradient in a total of 2335 square metres in area. In order for the project to be realized, the following must be done:

1. Preparation and clearance of the area, removal of bushes, tearing-down of old buildings, deracination in a depth of 25 cm. especially in the area of the rising gradient. 

2. Demolition of already existing stoneworks inside the expropriated area and part-demolition of the rising gradient in order to reach the desirable height defined by the...

The work concerns the reformation of Tritaki area that constitutes part of the old city of Patras. The region has extent 2.802,00sm , is found in North-NorthEast end of the castle of Patras, in the foot of hill of castle and part of the buildings are adjoined on the wall of castle and are manufactured on it's foundations. The interventions that will become in the frames of reformation of the area forecast:

-the flattening of existing paving and the placement above special kind of stones from the region of Arta coloured white and yellow covering of total area 2.000,00 m2....

The Old Arctic Market of Patras (Argiri Market) is a characteristic sample of Market buildings created after Greece purchased her freedom, it occupies a whole building block and is encompassed by three central roads of the city. An introvert building with internal atrium and two internal arcades with square columns faced towards the atrium. The building was almost symmetrical with as a sovereign element the configuration of its central entrance from Ag. Andreou road. The plot is of 1400m 2 surface with stone-built building of 1200m2. 
A big part of the building (half of its surface) has...

The building which now hosts the buildings of the Budapest Municipality was originally planned to be a hospital, later it worked as military barracks. Since Budapest Municipality owns it it was adopted and enlarged many times. Amongs others new office buildings, theater, fire station and a bazaar with many little shops were building during time. Due to the central location of the site, there were many plans for the renewal of the block in last few years.
Presently the aim is to create a center of mixed functions: agora, cultural functions (concert hall, exhibitions etc., hotel,...

This project is one of the 14 national "example" projects for "Developmental Spatial Planning" (integrated regional developmental planning). The project is located in the delta of the river IJssel, a branch of the Rhine. The area features a unique open landscape and is therefore designated a National Landscape. Here, a growing safety problem related to floodrisk has to be handled ("room for the river"), and a major housing target has to be adressed. A new railway tracé has been endorsed and will have to be realised by the year 2012. The aim of the...

The project « Heart of town » in Lobbes (a municipality of Belgium near the city of Charleroi) is realised as part of the european programme “Phasing out - Objective One - Hainaut”. It is question to fit out the communal square and the approaches of the collegiate church of Lobbes.

These two places are central and important at town level, which forms with the city of Thuin a developing tourist pool on the territory of the Haute-Sambre.

A greyfield redevelopment of a former shopping mall, Century Park will create nearly 3000 new residences, along with 18,000 m2 of office space and 15,000 m2 of retail space, adjacent to a major rapid transit station.
This is the first large-scale development of this kind in Edmonton, transplanting the Vancouver model of 'tower and podium' highrise design. This approach mixes street-level townhouses that front directly onto the street with high rises that are stepped back, achieving density without compromising human scale and an attractive pedestrian environment.

The aim of this project is to provide municipalities with information regarding obligations that arise from legislative amendments that have been newly adopted or are currently under preparation, and to show examples of possible ways of solving such issues in the Czech Republic and abroad, as well as possible sources of funding in this area. The main target group for this project is representatives of small municipalities (levels I and II), which currently have insufficient access to environmental information. Thematically focused seminars are seen by municipal representatives as a...

Green city for the tourism and the recreation

stimulating of small and medium enterprises’ development from touristic and recreational sector”



Leading objective of a project was increasing economic activity of small and medium enterprises (SME) operating in tourist and recreational sector, by creating adequate grounds to effective utilize of city green areas potential. Supporting objective of a project was tighten up links of cross-border cooperation between Lviv city and entrepreneurs operating in recreational sector in Eats side of the border, additional...

Rio Fortress is found on the most extreme point of the homonym cape on the western entrance of the Corinthian gulf. The top of the cape is headed North where the Fortress is incorporated along with its central entrance and perimeters ditch of protection placed on the South. The proposed project includes restoring the rampart and more specifically rebuilding the main entrance gate on the south, sections of the perimeter's walls on the south and buildings within the Fortress, ditch restoration and degradation of all the newest constructions of the army. With these proposals the...